
All Content

Greenzone Termite Barrier
At the end of this presentation, you should be able to:
1. Identify termite entry points in building design.
2. Specify compliant termite management systems in accordance with AS 3660.1.
3. Document continuous barrier systems and inspection zones in architectural drawings
NSCA Performance Criteria
Project Initiation and Conceptual Design: PC28, PC31
Detailed Design and Construction Documentation: PC39, PC45
You may adjust the resolution at the bottom right corner of your screen.