Archinterface

Demystifying Ironmongery

cpd

Description

Learning Outcomes:
1. What is ironmongery?
2. What are the components required on a particular door?
3. What are the Building Code requirements?
4. What are the five steps to an ironmongery specification?
5. How to get from a set of plans, a door schedule from the Architect to a door hardware /ironmongery schedule?

NSCA Performance Criteria:
Project Initiation and Conceptual Design: PC18, PC28
Detailed Design and Documentation: PC39, PC44, PC45

Loading...